Local cover image
Local cover image
Image from Google Jackets

Water Quality, Demand & Supply Gap-analysis Of Drinking Water Of Nawabshah City (ME Thesis)

By: Contributor(s): Material type: TextPublication details: Nawabshah QUEST, 2015.Description: 64pOnline resources:
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Thesis and Dissertation Research Section Available MP/79-1090
Thesis and Dissertation Research Section Available MP/24-252
Thesis and Dissertation Research Section Available MP/09-88
Total holds: 0

ABSTRACT


The purpose of my study to discover water quality demand and supply gap analysis of nawabshah city, during research work eight water samples were collected from different conlonies of city that water is being supplying from water treatment plants which located at Rohri Canal and Gajrah Wah Canal, After the analysis of sample only single sample having ID NO, WQL-NWS 945 which are collected from Garibabad high level of TDS 2200mgl/1 and hardness is 1000mg/1 which are at objectionable limit that cannot meet WHO guidelines and other water samples are within WHO guidelines limit
After that two water ampl also collected from Rohri Canal and Gajrah Wah Canal water treatment plants before entering int BODS and COD of water test also conducted but results within WHO guidelines.
The other part of study are water demand, supply and gap analysis of Nawabshah city, from the finding the past scenario of water supply 1998 to 2003 a very much water shortfall is find out only SMGD water supplied, after that water supply schemes were introduced as from phase - I to phase -V for to overcome water shortage, currently at 2015 the capacity of total water treatment plants is 24.51MGD, the water demand for the city reached in year of 2030 at 24.53MGD, during the research one of the major issue find out is short fall of electricity and low voltage which cause the hindrances during the running of water treatment plant, so it is the duty of government to resolve all issue to continuous water supply for the
inhabitants of city.

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image
Share