Water Quality, Demand & Supply Gap-analysis Of Drinking Water Of Nawabshah City (ME Thesis) (Record no. 56051)

MARC details
000 -LEADER
fixed length control field 02002nam a22001337a 4500
100 ## - MAIN ENTRY--AUTHOR NAME
Personal name Jalalani, Jamal u Ddin
-- 09MEEE11
-- Engr. Kishan Chand Mukwana
245 ## - TITLE STATEMENT
Title Water Quality, Demand & Supply Gap-analysis Of Drinking Water Of Nawabshah City (ME Thesis)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication Nawabshah
Name of publisher QUEST,
Year of publication 2015.
300 ## - PHYSICAL DESCRIPTION
Number of Pages 64p, :
500 ## - GENERAL NOTE
General note ABSTRACT<br/><br/><br/>The purpose of my study to discover water quality demand and supply gap analysis of nawabshah city, during research work eight water samples were collected from different conlonies of city that water is being supplying from water treatment plants which located at Rohri Canal and Gajrah Wah Canal, After the analysis of sample only single sample having ID NO, WQL-NWS 945 which are collected from Garibabad high level of TDS 2200mgl/1 and hardness is 1000mg/1 which are at objectionable limit that cannot meet WHO guidelines and other water samples are within WHO guidelines limit <br/>After that two water ampl also collected from Rohri Canal and Gajrah Wah Canal water treatment plants before entering int BODS and COD of water test also conducted but results within WHO guidelines.<br/>The other part of study are water demand, supply and gap analysis of Nawabshah city, from the finding the past scenario of water supply 1998 to 2003 a very much water shortfall is find out only SMGD water supplied, after that water supply schemes were introduced as from phase - I to phase -V for to overcome water shortage, currently at 2015 the capacity of total water treatment plants is 24.51MGD, the water demand for the city reached in year of 2030 at 24.53MGD, during the research one of the major issue find out is short fall of electricity and low voltage which cause the hindrances during the running of water treatment plant, so it is the duty of government to resolve all issue to continuous water supply for the<br/>inhabitants of city.<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Department Of Energy & Environment Engineering
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier https://tinyurl.com/2ce8wzj
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Thesis and Dissertation
Holdings
Withdrawn status Lost status Home library Current library Date acquired Accession Number Koha item type
    Research Section Research Section 24/11/2016 MP/09-88 Thesis and Dissertation
    Research Section Research Section 25/09/2018 MP/24-252 Thesis and Dissertation
    Research Section Research Section 23/10/2023 MP/79-1090 Thesis and Dissertation