02325nam a22001697a 4500999001700000100006500017245009700082260002900179300001100208500154600219700005301765856003201818942001101850952008901861952010201950952010302052 c56051d56048 aJalalani, Jamal u Ddina09MEEE11aEngr. Kishan Chand Mukwana aWater Quality, Demand & Supply Gap-analysis Of Drinking Water Of Nawabshah City (ME Thesis) aNawabshahbQUEST,c2015. a64p, : aABSTRACT The purpose of my study to discover water quality demand and supply gap analysis of nawabshah city, during research work eight water samples were collected from different conlonies of city that water is being supplying from water treatment plants which located at Rohri Canal and Gajrah Wah Canal, After the analysis of sample only single sample having ID NO, WQL-NWS 945 which are collected from Garibabad high level of TDS 2200mgl/1 and hardness is 1000mg/1 which are at objectionable limit that cannot meet WHO guidelines and other water samples are within WHO guidelines limit After that two water ampl also collected from Rohri Canal and Gajrah Wah Canal water treatment plants before entering int BODS and COD of water test also conducted but results within WHO guidelines. The other part of study are water demand, supply and gap analysis of Nawabshah city, from the finding the past scenario of water supply 1998 to 2003 a very much water shortfall is find out only SMGD water supplied, after that water supply schemes were introduced as from phase - I to phase -V for to overcome water shortage, currently at 2015 the capacity of total water treatment plants is 24.51MGD, the water demand for the city reached in year of 2030 at 24.53MGD, during the research one of the major issue find out is short fall of electricity and low voltage which cause the hindrances during the running of water treatment plant, so it is the duty of government to resolve all issue to continuous water supply for the inhabitants of city.  aDepartment Of Energy & Environment Engineering  uhttps://tinyurl.com/2ce8wzj cTHESIS 00104070aRESEARCHbRESEARCHd2016-11-24l0pMP/09-88r2016-11-24 00:00:00yTHESIS 00104070aRESEARCHbRESEARCHd2018-09-25l0pMP/24-252r2018-09-25 00:00:00w2018-09-25yTHESIS 00104070aRESEARCHbRESEARCHd2023-10-23l0pMP/79-1090r2023-10-23 00:00:00w2023-10-23yTHESIS